Maplewood Township,
Minnesota
Maplewood Townhall
Improvements
MOORE PROJECT NO. 21161

Owner is requesting Bids for
the construction of the project
listed above.
Bids for the construction of the
Project will be received at Moore
Engineering, Inc. located at 1808
East Fir Avenue, Fergus Falls, MN
56537, until April 17, 2020, at
11:00 a.m local time. At that time
the Bids received will be publicly
opened and read.
The Project includes the following
Work: The constructing of
a town hall and other miscellaneous
items.
Obtaining the Bidding
Documents
Digital project bidding documents
will be available at
www.mooreengineeringinc.com
by clicking the Bid Information tab,
or at www.questcdn.com. You may
download the complete set of digital
documents for a nonrefundable
fee of $20.00 by locating
eBidDoc™ Number 6861618 on
the website. Please contact
QuestCDN.com at 952-233-1632
or info@questcdn.com for assistance
in membership registration,
downloading and working with this
digital project information.
The Issuing Office for the Bidding
Documents is:
Moore Engineering, Inc.
1808 E Fir Avenue,
Fergus Falls, MN 56537-3974
Prospective Bidders may examine
the Bidding Documents at
the Issuing Office Monday through
Friday between the hours of 8:00
a.m. to 5:00 p.m.
All Bids shall be accompanied
with a signed statement under
oath by the Bidder’s owner or officer
verifying compliance with
Minn. Stat. 16C.285 meeting the
“Responsible Contractor” requirements.
Also included will be a list
of all of its first-tier subcontractors
that it intends to retain for work on
the project.

  1. Any prime contractor or subcontractor
    that does not meet the
    minimum criteria established for a
    responsible contractor as defined
    by Minn. Stat. 16C.285 Subd. 3 or
    fails to verify that it meets those
    criteria is not a “Responsible Contractor”
    and is not eligible to be
    awarded a construction contract
    for the project or to perform work
    on the project. 2. A false
    statement under oath verifying
    compliance with any of the minimum
    criteria shall make the prime
    contractor or subcontractor that
    makes the false statement ineligible
    to be awarded a construction
    project and may result in termination
    of a contract awarded to a
    prime contractor or subcontractor
    that submits a false statement.
  2. A prime contractor shall submit
    to the contracting authority,
    upon request, copies of the signed
    verifications of compliance from all
    subcontractors.
    Instructions to Bidders
    For all further requirements regarding
    bid submittal, qualifications,
    procedures, and contract
    award, refer to the Instructions to
    Bidders that are included in the
    Bidding Documents.
    This Advertisement is
    issued by:
    Owner: Maplewood Township
    By: Craig Ripley
    Title: Designated Representative